General view of the yard, looking between stored turbine blades towards the base of a mobile crane
- Date:
- 29 Aug 2024
- Location:
- General Electric Renewable Energy, Installation Yard for Dogger Bank A, B and C Wind Farm, Tees Road, Able Seaton Port, Hartlepool
- Reference:
- DP486611
- Type:
- Photograph (Digital)