Detail of a section of a 13MW Haliade-X turbine stored ready for loading onto an offshore jack-up vessel for installation in the North Sea wind farm
- Date:
- 29 Aug 2024
- Location:
- General Electric Renewable Energy, Installation Yard for Dogger Bank A, B and C Wind Farm, Tees Road, Able Seaton Port, Hartlepool
- Reference:
- DP486610
- Type:
- Photograph (Digital)