General view of the yard, with 13MW Haliade-X turbines stored in sections in the foreground and the Brent Charlie oil rig beyond, during its decommissioning
- Date:
- 29 Aug 2024
- Location:
- General Electric Renewable Energy, Installation Yard for Dogger Bank A, B and C Wind Farm, Tees Road, Able Seaton Port, Hartlepool
- Reference:
- DP486605
- Type:
- Photograph (Digital)