General view of the yard and dock from the north-west, showing turbine blades ready for shipping to the offshore wind farm site and the Brent Charlie oil rig being decommissioned

Date:
29 Aug 2024
Location:
General Electric Renewable Energy, Installation Yard for Dogger Bank A, B and C Wind Farm, Tees Road, Able Seaton Port, Hartlepool
Reference:
DP486594
Type:
Photograph (Digital)
Explore our collections: Search over 1.5 million records

Description

Photographer's note: 'GE Renewable Energy'’s 13MW Haliade-X turbines (one of the largest and most powerful in the world) stored in sections ready for loading onto the offshore jack-up vessel, Voltaire, for installation in the North Sea. Drone view of Voltaire loaded up with 107m blades ready for shipping to Dogger Bank the evening the image was taken.'

Content

This is part of the Job: 2K/28718 Installation Yard for Dogger Bank A, B and C Wind Farm, General Electric Renewable Energy, Able Seaton Port, Tees Road, Hartlepool, County Durham; within the Volume: VF000475 Climate Change; within the Series: HEC01/123 Climate Change; within the Collection: HEC01 Historic England

Rights

© Historic England Archive

People & Organisations

Photographer: Bull, Alun: Historic England

Keywords

Port, Dock, Oil Rig, Wind Turbine